38 brave souls started the Soquel Demonstration Forest Trailwork season off with a bang. Half of the volunteers drove up Sulphur Springs to Ridge and worked their way down Braille. The other half started at the bottom of Braille and worked their way up. We built a number of cool features and got the trails ready for rain. It was just in time, the rain started as we were packing up and the storm rolled in. A big thank you to everyone that help start the season out right!
Scott Robinson, Crew Leader

Trailwork notice

Coffee Service Starts The Day.
Refreshements were served
on top of the ROMP tool trailer.

Clearing the debris out from under
the humbolt crossing. These logs get lifted
off their rocky seats once per year to remove
accumulated leaves and dirt from below.

Bob leads a drain repair on the steep section.

Kelly begins to cut into a Madrone
that fell onto the trail last year.

The Madrone fell onto a wall ride
that was cleared the year before.

Chris lends a hand cutting and dragging.